MKI in it's present shape will be good enough to go up against PAF but only barely.Only way we can increase fighter count before 2027-28 time frame @_Anonymous_ mentions is by building more Su 30..
That's the crux of the problem. If we're getting the 12 replacement MKIs what shape are we getting them in ? I was given to understand it'd be in the Super Sukhoi configuration . If that's the case how come the entire upgrade program is taking up to 2032 to fructify when we're scheduled to receive these 12 MKIs in a couple of years ?But UPG program timeline is 7 years .
Virupaksa may not be ready for integration in 2-3 years.
We'd be lucky to get the first tranche of Mk-1a by 2030. And 12 nos MKI . Make no mistake about that . Plus 26 Rafale M. Anything additional is a bonus.Lca mk1A going at accelerated pace is limited by engines availability. So it's already maxed out.
4 squads of Mk1A + 2 squads of Su 30 ( if signed) is the max we can get by 2028 .
"We'd fight with what we have " Gen V.P.Malik (1999)
Please sear that phrase into you're consciousness for we're doing everything in our power to live up to this maxim once again & will keep repeating it for we're not a serious country.
Post that post 2028 will be
Second tranche of Mk1A
Su 30 UPG
Marine Rafale.



