Iam looking forward to Agnikul Cosmos. Their Agnibaan rocket liftoff mass is mere 14-Tons which is 1/3 of Skyroot Solid Fuel Rocket .It represents pinnacle technology almost equivalent to Rocket Lab Electron Rocket.NSIL has outsourced production of that to HAL
![]()
HAL wins ₹511-crore deal to build, own and commercialise SSLV launches
HAL wins bid for ISRO's SSLV technology transfer, to independently build and commercialize rockets, strengthening India's space capabilities.www.thehindu.com
I wonder with PSLV and SSLV outsourced to L&T and HAL, and LVM3 getting outsourced too, will ISRO maintain launch vehicle production capacity or shut them down completely like I presume NASA did?
