Indian Air Force : Updates & Discussions

  • Thread starter Thread starter Tarun
  • Start date Start date
ADA has a issued tender for in-sourcing of 100 people for a period of 1 year for various works.
GEM/2026/B/7597909

Work Package 1​

a. General Activities
Support to FOC/IOC of LCA Mk2 activities including flight line / aircraft build coordination/CADDMU/aerodynamic design/CFD analysis, FE structural analysis/HUMS, fuel system design modifications / Quality Assurance and Testing and any other technical job assigned by the coordinator.

b. Brief Description of Work package activities
  • Support to flight line activities, water proofing, wet runway trials, lightning, aircraft build coordination activities, CAD/DMU, GSE/GHE and reverse engineering.
  • Design coordination of aircraft parts, assemblies, tracking and updating of drawings release/LRU, coordination of kit installation, schedule updating and tracking of LCA Navy projects with flight-testing.
  • Planning, coordination wind tunnels tests and carry data analysis, CFD analysis, aerodynamics design, prediction and evaluation of flight performance.
  • Preparation of structural layouts and analysis using CAD/CAE packages, HUMS data analysis and correction, migration of FE structural dynamic models, dynamic flutter analysis, flight vibration data monitoring, design liaison with CMD for Drop Tank Parts
  • Fuel system design/modifications across LCA variants, AMCA, development of Retractable Refueling System, Design and development of testing fixture for fuel qualification testing, CAD modeling and detailing/sub-assemhly
    drawing etc.
  • Quality Assurance and Testing of Hydraulic and Fuel System LRUs, QA coverage on Mechanical Systems and Avionics Systems at RD-AQA (ARDC) and Reliability & System Safety activities, LRUs life record maintenance, schedule preparation and life data update.

Work Package 2​

a. General Activities
Support for LCA Mk2 activities including development of system, embedded software system, Simulation, Hardware development, preparation of documents of design, Module integration & module level testing; Qualification testing of LRUs, testing of SBCs PMC/VME cards; Verification & validation of LRU software at various levels of testing and testing at test rigs & any other technical job assigned by
the coordinator.