LCA AF Mk2 (Medium Weight Fighter) - News and discussions

You think 12–13 squadrons is a small number? What exactly was our alternative? Buying the Gripen E? Brazil’s order for just 36 jets was worth $5.5 billion.

I am not talking about the numbers, I am talking about the priority of the project seeing the current situation at the border.

You have total of 6 GE414-IN engines at the moment, in those you have to develop five AMCA prototypes one LCA MK2 PV1 prototype and one TEDBF prototype within 5 years and test it and same time sign the deal to order more engines, if no indigenous option is available. Let's assign two engines for each of the above projects, it will only delay all three of them.

Even if you get adequate engines supplies where are you going to install it? On an unfinished project or somewhere which is close to conduct first sorties?


Apart from that, AMCA project is planned in a better way compared to LCAmk2 which will require multiple structural changes before the test flight. The frame of AMCA is in better position than LCAmk2 to be tested.

Now, let us not talk about Brazil, they don't have friendly neighbours like India has. Why do you think there is a massive preparations going on on Indian side and on adversary side, have you seen the way they are buying and upgrading themselves, clearly says that situation is very unpredictive.


We would still have to deal with datalink integration, interoperability and various other technical challenges. Moreover, Gripen E deliveries themselves began relatively recently. So what other options we had.

For a $4 trillion economy like India, acquiring 12–13 squadrons is a substantial commitment, both financially and strategically. As our economy expands and domestic manufacturing capabilities mature, we can obviously scale production and procurement well beyond that number.

No one is saying to abandon the LCA MK2 project, single engine medium weight fighter is required but keeping the current geopolitical situation in mind you should allocate the resources and brain power in such a way that you strengthen what you have got, , like LCA Mk1A, this bird is going through new upgrades has got new avionics suite, self protection jammers, DARE electronic warfare suite, it's naval version is ready, AMCA first prototype frame is being tested for radar signature etc. Where is Lca MK2 frame?

Be little practical with the approach.
 
1000410488.png

I don't understand the hate against Mk2. It got CCS approval in 2022, funds started coming in 2023, and anyone who follows tenders knows how bureaucracy works, where even setting up jigs requires permission from bureaucrats in Delhi.

AMCA isn't starting full scale production before 2037. Mk2 will come around 2032 to 2033, around the same time Rafale deliveries would start, assuming that deal happens. I don't see it happening, tbh, nor do I see the budget, nonetheless.

But let's say they do come. The 42 squadrons is an old number, and even for that, the IAF needs to induct 40 aircraft per year. That can't happen without Mk2, or there will be another significant gap in strength. We aren't a small country, and I don't think the IAF wanting to fly Rafale and MKI for peacetime duties.

I don't even understand why the IAF needs a twin engine MWF. It offers neither the cost and maintenance advantages of a single engine LWF like F16, Mk1, Mk2, nor the range and firepower of the MKI or F15. The IAF should have been a "Hi-Lo" mix force.

Even AMCA should have been around AL31, followed by a huge mass flow, 150 to 180 kN engine of our own. We can't field AMCA in huge numbers either. That thing is going to cost more to build and maintain.

There are engineering issues with Mk2, but a bigger issue is giving stupid timelines. DRDO and HAL are both getting restructured now, along with HR reforms.

Mk2 is needed, any day, any year. It will serve for a good 20 to 30 years. It's our own, so upgrades and a lot of private sector missiles and equipment will come around that time too. It gives good enough range and firepower, is single engine, and has lower maintenance.


 
  • Like
Reactions: Photon Vish
Nope. The work has been going on and we shall see the full jet with final configuration at Aero India 2027. LCA MK2 is our own Gripen E and is too important to get dropped.
Wait till you hear about Su-75 first flight. You will change sides for the mother Russia.

Soviet Union GIF
 
He is trying to say that rolling out the Mk2 with the F414 will take away our negotiating power. Although, there seem to be more issues with it.
> Planning 3 jets on F414 engine made by a capitalist nation was a mistake, delay, arm-twisting, waiting to happen.
> Now they're demanding 3x cost of engine.

I only know they were trying to get both prototypes as close to the production model as possible. Some systems, like the retractable refuelling probe and a lot of subsystems, might happen early on. I tweeted way back about the GaN radar and retractable IFR coming in from the 2nd prototype onwards. I think it might happen early, but can't confirm.
PSU system has been a snail. When making the 1st canard jet, a TD/X-jet should be flown a.s.a.p. for FCS development. The aux components can take their time & the fuselage can be adapted later.

There are some other issues with the Mk2 too, including those with the canards and intakes. I don't know if they've been resolved or not. Maybe someone here with more knowledge can comment on the aerodynamics.

"There would be intake buzz at certain Mach nos. Attached is a simple sketch of the problem and it shows that the shock wave off the L.E. canard would impinge on the inlet between 1.1 and 1.3 Mach starting a buzz. It would continue beyond M 1.6"

View attachment 55662

Here is the solution most likely being used


View attachment 55661


> This problem was crystal clear since beginning. I always wondered that -
- the canard might distract the pilot.​
- How will it move properly?​
- Will it strike the wing LERX?​
- Will canopy open properly, especially during ejection, etc?​
> The diagram doesn't show properly the canard's rotated position.
> The canard should have been outward like in Gripen & Rafale.
> Rafale's canard has an earmark cut on trailing edge root.

> Now if they adjust the intake then good opportunity to give MWF geometric stealth treatment.
Geometric shaping came out publicly with USAF's ATF project in 1990.
Many documentaries in 1990s shared interviews of their test pilots, chief designers, engineers, program managers, etc who said geometry alone reduces RCS a lot. Some of those videos are still available on Youtube. So in 30-35 years also MWF didn't get geometric shaping, although TEDBF seems to have some, and RAM paint is ready now. How difficult was this to do in 35 years:
View attachment 39443
I'm avoiding DSI due to more stealth hence the only other option is of F-22.
- 1 engine of F414 class or AL-31/41/F-100/110 class initially. If USA gives just the F135 engine then nice :ROFLMAO: But still F-35 TWR is not like F-22.
- 2 side intakes to make some IWB & SWB.
- IWB can carry 4 BVR-AAMs or 2 AGMs. Each SWB can carry 1, may be 2 CCMs, depends on size.
- half length all-moving rudder which can be researched into tail-less or rotating rudder-stab.
- Wing shape & size not determined yet.
- Some people might want canards for Naval model.
The 1st/top one's fuselage outline looks like cousin of Su-75 (F-22 inlet cut half width-wise)
The middle one like child of Su-57 + F-22 🤦‍♂️ (F-22 inlet cut half height-wise)
The below one like younger sibling of F-35 (F-22 inlet reduced to 1/4th quadrant)
NOTE: These are notional & not to scale.
View attachment 39474




ADA has its fair share of issues. I don't like the organisation that much in the first place. I place more faith in ARDC and HAL.

> This is why PPP is needed in most populous nation to extract remaining talent among 25 million+ techies passed out since 2000 AD, mostly working on outsourcing basis, mostly process oriented rather than product oriented.




View attachment 55663

I don't understand the hate against Mk2. It got CCS approval in 2022, funds started coming in 2023, and anyone who follows tenders knows how bureaucracy works, where even setting up jigs requires permission from bureaucrats in Delhi.

AMCA isn't starting full scale production before 2037. Mk2 will come around 2032 to 2033, around the same time Rafale deliveries would start, assuming that deal happens. I don't see it happening, tbh, nor do I see the budget, nonetheless.

But let's say they do come. The 42 squadrons is an old number, and even for that, the IAF needs to induct 40 aircraft per year. That can't happen without Mk2, or there will be another significant gap in strength. We aren't a small country, and I don't think the IAF wanting to fly Rafale and MKI for peacetime duties.

I don't even understand why the IAF needs a twin engine MWF. It offers neither the cost and maintenance advantages of a single engine LWF like F16, Mk1, Mk2, nor the range and firepower of the MKI or F15. The IAF should have been a "Hi-Lo" mix force.

Even AMCA should have been around AL31, followed by a huge mass flow, 150 to 180 kN engine of our own. We can't field AMCA in huge numbers either. That thing is going to cost more to build and maintain.

There are engineering issues with Mk2, but a bigger issue is giving stupid timelines. DRDO and HAL are both getting restructured now, along with HR reforms.

Mk2 is needed, any day, any year. It will serve for a good 20 to 30 years. It's our own, so upgrades and a lot of private sector missiles and equipment will come around that time too. It gives good enough range and firepower, is single engine, and has lower maintenance.



> You answered your own question to hating remaking obsolete tech which will be hunted by 5/6gen killing 4gen pilots, but not us. Hence some of us are still romancing with 4gen -
- We know how monopolistic bureaucracy works like snail. 5 fingers different so 1000s of PSU employees would think differently, but talent suppressed, many might have resigned, many staying silent due to family needs, pension, etc.​
- In era of 6gen, a new 4gen jet with new components on inside but badly visible on outside & then soon 5gen AMCA with same F414 engine would get inducted. This is a clear technical conflict. Has anybody thought of 1 engine AMCA?​
- If AMCA should get big engine like AL-31 then it becomes 5gen AHCA. If 180 KN is given then it becomes a new 6gen AHCA. Weapons size & capacity dictate jet size. Then why not give 2nd engine or to MWF?​
- F-16 has bigger better engines of F-100 & F-110. F-35 got even better engine. But MWF is restricted due to F414. If AL-31 desired for AMCA then Al-41 or F100/110 for MWF should have been desired.​
- We aren't a small nation & a small jet, with just 1 small/medium engine, needing EFTs, desired with 2 seats, is not solution for future peace time or war time. But 1-engine UCAV is ok for CAP, etc. Other types of UAVs needed.​
- 42+/-squads would have manned jets + their MUMT-UCAVs.​
- Defence has always been costly matter when most civilians want costly, over-budgeted gadgets & accessories. We pay insurance premium for our health, car, bike. Hence CAPEX & OPEX of 2nd engine is worth safety, redundancy.​
- Just 20-30 yrs when airframe has life of 40-60 years? Make it 5gen & use for 40-60 yrs.​
- MWF = MEDIUM WEIGHT, hence -​
~ if 1 MEDIUM engine like F414 can't balance thrust, drag, lift, agility, capacity, then 2 engine needed,​
~ also giving safe redundancy looking at 12-15 F-35 crashes.​
~ Rafale's dry & wet ATWR is much better than MWF & Gripen.​
~ LCA should have been 2 engine like F-18 A/B/C/D & MWF like F-18 E/F, but not allowing engine arm-twisting by 1 maker.​
​
1795683024890.png​
​
 
  • Like
Reactions: Photon Vish
Apparently $800m was just the cost of setting up the local assembly line for F414. The engines themselves cost extra. We wouldn't have been in this situation if we'd atleast concluded the deal w/Safran for the 110kN engine.

These pressure tactics could be aimed at getting India to sign off on the bilateral trade deal. Trump has just announced new tariffs on India of 25% wef Jan 2027.
 
~ Rafale's dry & wet ATWR is much better than MWF & Gripen.~ LCA should have been 2 engine like F-18 A/B/C/D & MWF like F-18 E/F, but not allowing engine arm-twisting by 1 maker.
~ LCA should have been 2 engine like F-18 A/B/C/D & MWF like F-18 E/F, but not allowing engine arm-twisting by 1 maker.

This is basically also one of the reason to my understanding why Indian navy ousted itself completely from LCA program and now 2 engine fighter is being designed for naval air arm.

They have to go for the policy of developing engine first and then planning a fuselage around it to set the weight limit right.
 
  • Like
Reactions: Photon Vish
Wait till you hear about Su-75 first flight. You will change sides for the mother Russia.
Nope. No Su-75 for us. And only side for me is Mother India. Btw, Su-57MKI/60MKI is still happening, doesnt matter whether you like it or not;)
Apparently $800m was just the cost of setting up the local assembly line for F414. The engines themselves cost extra. We wouldn't have been in this situation if we'd atleast concluded the deal w/Safran for the 110kN engine.

These pressure tactics could be aimed at getting India to sign off on the bilateral trade deal. Trump has just announced new tariffs on India of 25% wef Jan 2027.
Despite Trump's tantrums, USA is too important for our future and defence cooperation with them shall continue.
 
  • Like
Reactions: Aniruddha
This is basically also one of the reason to my understanding why Indian navy ousted itself completely from LCA program and now 2 engine fighter is being designed for naval air arm.

They have to go for the policy of developing engine first and then planning a fuselage around it to set the weight limit right.
Yes, no single-engined jet for IN, though it makes perfect sense for IAF due to OpEx. Twin-engined jets are very costly.
 
> Planning 3 jets on F414 engine made by a capitalist nation was a mistake, delay, arm-twisting, waiting to happen.
> Now they're demanding 3x cost of engine.


PSU system has been a snail. When making the 1st canard jet, a TD/X-jet should be flown a.s.a.p. for FCS development. The aux components can take their time & the fuselage can be adapted later.



> This problem was crystal clear since beginning. I always wondered that -
- the canard might distract the pilot.​
- How will it move properly?​
- Will it strike the wing LERX?​
- Will canopy open properly, especially during ejection, etc?​
> The diagram doesn't show properly the canard's rotated position.
> The canard should have been outward like in Gripen & Rafale.
> Rafale's canard has an earmark cut on trailing edge root.

> Now if they adjust the intake then good opportunity to give MWF geometric stealth treatment.








> This is why PPP is needed in most populous nation to extract remaining talent among 25 million+ techies passed out since 2000 AD, mostly working on outsourcing basis, mostly process oriented rather than product oriented.






> You answered your own question to hating remaking obsolete tech which will be hunted by 5/6gen killing 4gen pilots, but not us. Hence some of us are still romancing with 4gen -
- We know how monopolistic bureaucracy works like snail. 5 fingers different so 1000s of PSU employees would think differently, but talent suppressed, many might have resigned, many staying silent due to family needs, pension, etc.​
- In era of 6gen, a new 4gen jet with new components on inside but badly visible on outside & then soon 5gen AMCA with same F414 engine would get inducted. This is a clear technical conflict. Has anybody thought of 1 engine AMCA?​
- If AMCA should get big engine like AL-31 then it becomes 5gen AHCA. If 180 KN is given then it becomes a new 6gen AHCA. Weapons size & capacity dictate jet size. Then why not give 2nd engine or to MWF?​
- F-16 has bigger better engines of F-100 & F-110. F-35 got even better engine. But MWF is restricted due to F414. If AL-31 desired for AMCA then Al-41 or F100/110 for MWF should have been desired.​
- We aren't a small nation & a small jet, with just 1 small/medium engine, needing EFTs, desired with 2 seats, is not solution for future peace time or war time. But 1-engine UCAV is ok for CAP, etc. Other types of UAVs needed.​
- 42+/-squads would have manned jets + their MUMT-UCAVs.​
- Defence has always been costly matter when most civilians want costly, over-budgeted gadgets & accessories. We pay insurance premium for our health, car, bike. Hence CAPEX & OPEX of 2nd engine is worth safety, redundancy.​
- Just 20-30 yrs when airframe has life of 40-60 years? Make it 5gen & use for 40-60 yrs.​
- MWF = MEDIUM WEIGHT, hence -​
~ if 1 MEDIUM engine like F414 can't balance thrust, drag, lift, agility, capacity, then 2 engine needed,​
~ also giving safe redundancy looking at 12-15 F-35 crashes.​
~ Rafale's dry & wet ATWR is much better than MWF & Gripen.​
~ LCA should have been 2 engine like F-18 A/B/C/D & MWF like F-18 E/F, but not allowing engine arm-twisting by 1 maker.​
​
​
1. Yes, depending on Shri Shri Strategic ally and partner was a mistake. Having no backup plan was even worse. Nonetheless, the leadership knows they need a sanction proof engine, whatever that may be. Including test facilities and all. Regarding engine, I'm an advocate for going with French, they'll bleed us, but hey, rafale is already coming, get them to make us M88-4(105 kN engine), have them fit inside already made Mk2, which their CEO said they are willing to do.

2. From whatever i read regarding this topic, at certain supersonic speeds (around Mach 1.1, 1.3+), shockwaves from the front canards can hit the engine's air intake lip, causing intake buzz, pushing unstable air.

Solution: Extending the intake lip forward (around 300mm) or adjusting geometry so shock waves/wakes don't interfere cleanly with the inlet lip, while noting drag tradeoff.

3. 4th gen aircrafts aren't going anywhere, not Su30, Mk1A, Mk2, F15, F16, thousands flankers with chinese all still relevant. I don't know what that 6th gen is, other than ACE, which only US has, I don't see much.

4. The point of LCA is cost, we make it dual engine, we're fixing twice as many engines, replacing twice as many multi cr turbine blades and discs, burning more fuel, even to do a basic daily sweep. Also building bigger blast pens, we stick to medium, small, stuff. Cause last time IAF was parking their su30 under then sun and couldn't even put them on forward airbases and had to send Mig21

1000410732.png
1000410733.png

5. I'm not against PPP, Mk2 would have been a great candidate for it. Give up front contract of 10 squadrons, let ADA and consortium make it.

1000410731.png

6. I see Mk2 dead. Even if they fly it tommorow, there is no engine, even if deal is signed, will US deliver?