LCA AF Mk2 (Medium Weight Fighter) - News and discussions

You think 12–13 squadrons is a small number? What exactly was our alternative? Buying the Gripen E? Brazil’s order for just 36 jets was worth $5.5 billion.

I am not talking about the numbers, I am talking about the priority of the project seeing the current situation at the border.

You have total of 6 GE414-IN engines at the moment, in those you have to develop five AMCA prototypes one LCA MK2 PV1 prototype and one TEDBF prototype within 5 years and test it and same time sign the deal to order more engines, if no indigenous option is available. Let's assign two engines for each of the above projects, it will only delay all three of them.

Even if you get adequate engines supplies where are you going to install it? On an unfinished project or somewhere which is close to conduct first sorties?


Apart from that, AMCA project is planned in a better way compared to LCAmk2 which will require multiple structural changes before the test flight. The frame of AMCA is in better position than LCAmk2 to be tested.

Now, let us not talk about Brazil, they don't have friendly neighbours like India has. Why do you think there is a massive preparations going on on Indian side and on adversary side, have you seen the way they are buying and upgrading themselves, clearly says that situation is very unpredictive.


We would still have to deal with datalink integration, interoperability and various other technical challenges. Moreover, Gripen E deliveries themselves began relatively recently. So what other options we had.

For a $4 trillion economy like India, acquiring 12–13 squadrons is a substantial commitment, both financially and strategically. As our economy expands and domestic manufacturing capabilities mature, we can obviously scale production and procurement well beyond that number.

No one is saying to abandon the LCA MK2 project, single engine medium weight fighter is required but keeping the current geopolitical situation in mind you should allocate the resources and brain power in such a way that you strengthen what you have got, , like LCA Mk1A, this bird is going through new upgrades has got new avionics suite, self protection jammers, DARE electronic warfare suite, it's naval version is ready, AMCA first prototype frame is being tested for radar signature etc. Where is Lca MK2 frame?

Be little practical with the approach.
 
1000410488.png

I don't understand the hate against Mk2. It got CCS approval in 2022, funds started coming in 2023, and anyone who follows tenders knows how bureaucracy works, where even setting up jigs requires permission from bureaucrats in Delhi.

AMCA isn't starting full scale production before 2037. Mk2 will come around 2032 to 2033, around the same time Rafale deliveries would start, assuming that deal happens. I don't see it happening, tbh, nor do I see the budget, nonetheless.

But let's say they do come. The 42 squadrons is an old number, and even for that, the IAF needs to induct 40 aircraft per year. That can't happen without Mk2, or there will be another significant gap in strength. We aren't a small country, and I don't think the IAF wanting to fly Rafale and MKI for peacetime duties.

I don't even understand why the IAF needs a twin engine MWF. It offers neither the cost and maintenance advantages of a single engine LWF like F16, Mk1, Mk2, nor the range and firepower of the MKI or F15. The IAF should have been a "Hi-Lo" mix force.

Even AMCA should have been around AL31, followed by a huge mass flow, 150 to 180 kN engine of our own. We can't field AMCA in huge numbers either. That thing is going to cost more to build and maintain.

There are engineering issues with Mk2, but a bigger issue is giving stupid timelines. DRDO and HAL are both getting restructured now, along with HR reforms.

Mk2 is needed, any day, any year. It will serve for a good 20 to 30 years. It's our own, so upgrades and a lot of private sector missiles and equipment will come around that time too. It gives good enough range and firepower, is single engine, and has lower maintenance.