You think 12–13 squadrons is a small number? What exactly was our alternative? Buying the Gripen E? Brazil’s order for just 36 jets was worth $5.5 billion.
I am not talking about the numbers, I am talking about the priority of the project seeing the current situation at the border.
You have total of 6 GE414-IN engines at the moment, in those you have to develop five AMCA prototypes one LCA MK2 PV1 prototype and one TEDBF prototype within 5 years and test it and same time sign the deal to order more engines, if no indigenous option is available. Let's assign two engines for each of the above projects, it will only delay all three of them.
Even if you get adequate engines supplies where are you going to install it? On an unfinished project or somewhere which is close to conduct first sorties?
Apart from that, AMCA project is planned in a better way compared to LCAmk2 which will require multiple structural changes before the test flight. The frame of AMCA is in better position than LCAmk2 to be tested.
Now, let us not talk about Brazil, they don't have friendly neighbours like India has. Why do you think there is a massive preparations going on on Indian side and on adversary side, have you seen the way they are buying and upgrading themselves, clearly says that situation is very unpredictive.
We would still have to deal with datalink integration, interoperability and various other technical challenges. Moreover, Gripen E deliveries themselves began relatively recently. So what other options we had.
For a $4 trillion economy like India, acquiring 12–13 squadrons is a substantial commitment, both financially and strategically. As our economy expands and domestic manufacturing capabilities mature, we can obviously scale production and procurement well beyond that number.
No one is saying to abandon the LCA MK2 project, single engine medium weight fighter is required but keeping the current geopolitical situation in mind you should allocate the resources and brain power in such a way that you strengthen what you have got, , like LCA Mk1A, this bird is going through new upgrades has got new avionics suite, self protection jammers, DARE electronic warfare suite, it's naval version is ready, AMCA first prototype frame is being tested for radar signature etc. Where is Lca MK2 frame?
Be little practical with the approach.