5th Gen FA is defined by certain universally accepted characteristics like higher bypass ratios , better material tech , better TWR etc.I have serious doubts that our negotiators would agree to pay so much for a 4th gen level engine. Let's see. Hopefully it's a 5th gen level engine.
I remember seeing a video of the current DG - GTRE out here ( either from very late last year or early this year ) stating their expectation from the JV was a TET for 1800°C ( not Kelvin ) with a slide from a PPT presentation denoting it as well as the classification of TFs the way GTRE understood it.
Now 1800°C is the TET of a lot of 4th / 4.5 Gen TFs. Why's the GTRE setting the bar so low ? It's quite obvious they lack the confidence to achieve even that much given lack of investment into such tech.
Why's that so ? It's coz the BA Hons in Eng Literature babooos in the MoD don't have any confidence in the abilities of the GTRE staff . As per the same babooos every project we undertake must result in tangible gains else it's a science project.
Our user department which happens to be the IAF still treats these developmental organisations like they're clients of the latter not as partner organisations like the way the IN treats these very same organizations. Result you don't see much participation of the IAF in these endeavours .
Things may be changing today but up until this point of time what I've described above was pretty much SOP. Result - while the DRDO / GTRE guys can realise this tech with current resources , it'd take them a decade to do so.
Hence they've decided to take it on the chin & make the best of a sub optimal deal for this means access to more funds , better infrastructure like better testing facilities or / & high performance forging press etc. What this would do is speed up their own developmental endeavours .
I fully expect the GTRE / DRDO to continue parallel development of the KED alongside the JV . You can also see this as our back up plan in case the JV delivers sub optimal results or is abandoned for whatever reason.
At the end of the day all these technologies are crown jewels which won't be parted with come what may. We'd have to develop it on our own like the Chinese did / are doing be it a heavy duty 170 KN TF or 2000° C plus TET & the material technology to go with it.
Our scientists are upto the task even if they work under severe constraints . Are our babooos upto the task ?
The answer is before you.
4-5 billion USD ( 40-50,000 crores) for the JV , possibly more vs 2500 crores for the development of the Kaveri & 5+ years for negotiations for 1800°C TET tech which IMHO wasn't the case at all but was for something much more than that which resulted in a cul de sac on expected lines.