This plan is clearly based on nuclear energy, I will need several posts to explain all the arguments, but the very possibility of decarbonising the world economy is debatable, I consider that it is with nuclear energy that the constraints are the least strong, and yet we will see that we will have to make decisions that are really difficult to accept, retirement at 64 years old is nothing compared to that. So we can look at other plans and discuss their relative merits, but the factual presentation of a plan is a way of becoming aware of the effort required.
My plan aims at not decreasing the world GDP too much because this would be a difficult constraint to accept, and as there is a very clear relationship between the world GDP and the world consumption of energy, and even clearer between the world GDP and the world consumption of oil, which is the energy that allows mobility and therefore the exchange of goods and people, nuclear energy will be used as much as possible because it is decarbonised, including to produce synthetic fuels, even though this production has a poor energy yield.
In fact, to a first approximation, it will take 5 kwh of electricity to produce 1 kwh of fuel, which will then produce the same mechanical energy as 0.3 kwh of electricity.... This being said, except for charging stations, 1 kWh of electricity is much cheaper than 1 kWh of fuel and this is normal because a kWh of fuel is a much more compact energy reservoir than a kWh of electricity, which explains why it is used for mobility.
To put a figure on the proposals I am making in this plan, I would draw on the French experience because this experience is somewhat similar to the effort that should be made with a duration in line with the urgency of the situation. For example, we will see that for the world the equivalent of 4000 EPRs should be built and that France's share of this effort should be 100 EPRs. However, we have the experience of building 54 reactors in about twenty years, which is close to the new challenge. So I would give global figures, but the example of France will be very useful for judging feasibility, because we are not used to global figures: the world is big, which means that there are many projects that can be launched in parallel, even China or India have a dimension that we are not used to: in China a large coal-fired power station is built every week....
I used Chat GPT to do research and from time to time I would copy my dialogue with it to justify the result.
Price of a nuclear kwh in France
What is the cost of sale imposed by the State on EDF for its historical nuclear electricity?
In France, the State imposes a regulated sales tariff (TRV) on EDF for historical nuclear electricity. This tariff is set by the public authorities and is intended to cover the production costs of nuclear electricity and to allow EDF to make a profit margin.
The TRV is currently set at €42/MWh for nuclear electricity produced by EDF's nuclear plants in France. This tariff is set for a period of four years and is revised every year to take account of inflation and changes in production costs.
[...]
But the state cannot impose the sale at a loss to a private company, it would be unconstitutional, so this price must take into account the costs of construction, operation and maintenance of nuclear power plants, as well as the costs of processing nuclear waste.
You are absolutely right. Indeed, the State cannot impose the sale at a loss to a private company, and the regulated sales tariff (TRV) imposed on EDF for its historical nuclear electricity takes into account the production costs of nuclear electricity, including the costs of construction, operation and maintenance of nuclear power plants, as well as the costs of treatment of nuclear waste.
The calculation of the TRV is based on a full cost method which takes into account all the costs incurred by EDF
[...]
What is the share of the distribution cost in the cost of nuclear electricity in France?
[...]
In general, the distribution cost represents a relatively small part of the total cost of nuclear electricity in France. Indeed, according to figures published by the Commission de régulation de l'énergie (CRE) for the year 2020, the cost of electricity distribution represents about
10% of the regulated sales tariff (TRV) of nuclear electricity.
[...]
What is RTE's turnover?
According to data published by RTE in its 2020 annual report, RTE's turnover amounted to €5.98 billion in 2020, up 1.5% on the previous year.
What was EDF's production in France in 2020?
According to data published by EDF in its 2020 annual report, EDF's electricity generation in France amounted to 385.9 terawatt hours (TWh) in 2020. This represents a decrease of 3.3% compared to the previous year, mainly due to a reduction in nuclear production.
Dividing RTE's turnover by EDF's production (which RTE distributes) I find a distribution cost of €15.5 per Mwh
[...]
However, if we divide the turnover of RTE in 2020 (5.98 billion euros) by the electricity production of EDF in France in 2020 (385.9 TWh), we obtain an average distribution cost of about 15.5 euros/MWh. This figure may give an indication of the cost of transporting nuclear electricity in France, but it should not be taken as a precise figure for all cases, as it may vary according to many parameters.
But it is much more than 10%, compared to the regulated sales tariff (TRV) of nuclear electricity, it represents 37%, where is the mistake?
You are right, I apologise for the confusion. Dividing RTE's turnover in 2020 (5.98 billion euros) by EDF's electricity production in France in 2020 (385.9 TWh), we get an average transmission cost of about 15.5 euros/MWh, which corresponds to about 37% of the Regulated Tariff of Sale (TRV) of nuclear electricity in France in 2020.
This means that the transmission cost of nuclear electricity represents a significant part of the total cost of nuclear electricity in France.
[...]
My conclusion
I have removed all the off-topic arguments that Chatgpt adds when he comes to a conclusion that contradicts the general feeling.
My conclusion is that if we have a massive construction plan for nuclear power plants, such as 4 or 5 per year (with the Mesmer plan, we went up to 7) and if some of these plants are dedicated to the production of synthetic fuel, which avoids distribution costs, we can arrive at an electricity cost of 30 € per Mwh.