LCA AF Mk2 (Medium Weight Fighter) - News and discussions

IMO they should limit mk2 to 3-4 squadrons

99 engines approximately would mean 4-5 Sqns with spare engines. But this project is delayed and not in the priority list. If you are able to get the engines for AMCA then LCA Mk2 can wait. AMCA should be the high priority along with Super Sukhoi, LCA MK1 and Rafales, to handle the immediate two front challenge in 5 years.
 
  • Agree
Reactions: Ginvincible
Mk2 is an absolute necessity for the future of the aerospace ecosystem. The ADA/HAL team will have to mess up the development in a royal way to screw up this program. If they couldn't get confidence from MoD and IAF in next 3-4 years its faith will be questioned. Few crashes can become the death knell.

Air warfare is changing fast, cant really predict the relevant of this class of fighter in 5-10 years. Also, remember the IAF didn't actually ask for a Mk2. The idea was precipitated by the Navy.

Tejas MK2 is CCS cleared and has IAF backing. Last i checked, CCS outranked DS, and IAF doesn't answer to DS.

Tejas MK2 is safe as long as they can secure the engines.
CCS is for the development funding not procurement.
 
Mk2 is an absolute necessity for the future of the aerospace ecosystem. The ADA/HAL team will have to mess up the development in a royal way to screw up this program. If they couldn't get confidence from MoD and IAF in next 3-4 years its faith will be questioned. Few crashes can become the death knell.

Air warfare is changing fast, cant really predict the relevant of this class of fighter in 5 years. Also, remember the IAF didn't actually ask for a Mk2. The idea was precipitated by the Navy.


CCS is for the development funding not procurement.
There are many things out there as necessary and did not happens, like follow on phalcon awacs,C17, etc . MK2 won't be a reality without GE F414 engine deal with USA. If that happens, yeas then there may be a chance. There is a chatter that USA had linked engine deal with trade deal with India.

I still in an opinion that, mk1a should have happened instead MK2 to should have pushed,and ADA should have choose EJ200 instead of F414 for MK2 & AMCA.
 
Last edited:
Ask @Hellfire he is the one said this long back in twitter. What ever he says in past happened to a reality later.
also few days back defence secretary too made skeptical statement on MK2.
See, people used to say the same thing about the Tejas in 2011 and 2012 in BR, and very senior IAF brass, but the Mk1A still happened.

The Mk2 story depends on two things, failing on both fronts is highly unlikely. One is that US-India relations deteriorate so much that the US sanctions F414 exports to India. The other is that India's economic growth stalls, leaving it without the surplus funds needed to procure the Mk2.

Otherwise, even pessimistically, your defence budget in 2035 would be at least around $130 billion, with the IAF requiring 60 squadrons to match the PLAAF.

Regardless of how many Rafales or AMCA the IAF manages to induct, it will still need a cheaper option to fill the numbers.
 
The GE F414 deal with 80% ToT is quite affordably priced at $800m. I doubt EJ200 could be priced similarly even if it were possible to switch to a new powerplant with the mk2 design is already frozen.

+ Don't we have a 10 yr defence coop agreement with the US?

Any sanctions could impact MRO/OTR services for USN warships at L&T as well. I doubt the US would want that.
 
Ask @Hellfire he is the one said this long back in twitter. What ever he says in past happened to a reality later.
also few days back defence secretary too made skeptical statement on MK2.
I know what he has been saying and I heard what DefSec said, yet I am telling you 100% certain that LCA MK2 is happening and we will procure over 200 of these. Wait and watch.
 
I am telling you 100% certain that LCA MK2
Mk2 is an absolute necessity for the future of the aerospace ecosystem.

See, people used to say the same thing about the Tejas in 2011 and 2012 in BR

it will still need a cheaper option to fill the numbers.


And on BR they were right, because Mk1 lost it's value with the time, it is a delayed project, and now suddenly it is no more required to fill in the numbers, every one is wishing for Mk2 to fill in the numbers. But same story, a delay of 1.5 decade to happen due to lack of engine technology.

In my opinion, India must strengthen what it already has and in that process Mk2 may someday become a reality.
 
  • Like
Reactions: Rajput Lion
The IAFs has always operated a mix of light, medium and heavy jets. Canceling mk2 would mean giving up on SE fighters almost entirely once m2000 leaves service. That would need a doctrinal shift in IAF thing.

Plus the opex bill of twin engine, 'high performance' jets like Rafale is no joke. Per hour flying costs are in the $16000 range per reports. The MKI costs around $10k to $40k per flight hour, depending on the source.
An SE fighter can balance these costs and preserve airframe life of heavier ac.

We can't have MKI, Rafale flying CAP sorties all the time. Mk1A and Mk2 are more suited for that.

Same reason why we need a medium transport to complement if not completely replace the C-17 for routine missions like HADR, anti-piracy SF ops, etc.
 
Last edited:
And on BR they were right, because Mk1 lost it's value with the time, it is a delayed project, and now suddenly it is no more required to fill in the numbers, every one is wishing for Mk2 to fill in the numbers. But same story, a delay of 1.5 decade to happen due to lack of engine technology.

In my opinion, India must strengthen what it already has and in that process Mk2 may someday become a reality.
You think 12–13 squadrons is a small number? What exactly was our alternative? Buying the Gripen E? Brazil’s order for just 36 jets was worth $5.5 billion.

We would still have to deal with datalink integration, interoperability and various other technical challenges. Moreover, Gripen E deliveries themselves began relatively recently. So what other options we had.

For a $4 trillion economy like India, acquiring 12–13 squadrons is a substantial commitment, both financially and strategically. As our economy expands and domestic manufacturing capabilities mature, we can obviously scale production and procurement well beyond that number.
 
The IAFs has always operated a mix of light, medium and heavy jets. Canceling mk2 would mean giving up on SE fighters almost entirely once m2000 leaves service. That would need a doctrinal shift in IAF thinking.

Plus the opex bill of twin engine, 'high performance' jets like Rafale is no joke. Per hour flying costs are in the $16000 range per reports. The MKI costs around $10k to $40k per flight hour, depending on the source.
An SE fighter can balance these costs and preserve airframe life of heavier ac.

We can't have MKI, Rafale flying CAP sorties all the time. Mk1A and Mk2 are more suited for that.

Same reason why we need a medium transport to complement if not completely replace the C-17 for routine missions like HADR, anti-piracy SF ops, etc.



The IAF chose to cap MKI production at 272 despite having a local production line and weapons/systems integration flexibility from the oem. Even when sqn numbers are down to 27-28, it has only ordered 12 attrition replacements. This was to try and manage opex costs from spiraling out of control.

Imo, Rafale numbers will likely not exceed 150 units over a ~10-12 yr production run either. A 2nd MWF aka mk2 will be essential to bridge the cost vs capability gap.

Even if AMCA were to arrive on time and meet expectations, we don't know what the opex costs will be like. There's a reason why global oem like LM and Sukhoi are coy about the turnaround times of F-35/Su-57. They need specialized equipment, airconditioned hangars for maintaining stealth coating/rcs, etc.
 
He is trying to say that rolling out the Mk2 with the F414 will take away our negotiating power. Although, there seem to be more issues with it. I only know they were trying to get both prototypes as close to the production model as possible. Some systems, like the retractable refuelling probe and a lot of subsystems, might happen early on. I tweeted way back about the GaN radar and retractable IFR coming in from the 2nd prototype onwards. I think it might happen early, but can't confirm.


There are some other issues with the Mk2 too, including those with the canards and intakes. I don't know if they've been resolved or not. Maybe someone here with more knowledge can comment on the aerodynamics.

"There would be intake buzz at certain Mach nos. Attached is a simple sketch of the problem and it shows that the shock wave off the L.E. canard would impinge on the inlet between 1.1 and 1.3 Mach starting a buzz. It would continue beyond M 1.6"

1000410358.jpg

Here is the solution most likely being used


1000410357.png


ADA has its fair share of issues. I don't like the organisation that much in the first place. I place more faith in ARDC and HAL.