LCA AF Mk2 (Medium Weight Fighter) - News and discussions


Defence Secretary Rajesh Kumar Singh says, "As of now, the LCA Mk2 is still on, with the first flight scheduled for the middle of next year. Let the prototypes come and let the Air Force evaluate them, and thereafter, we will see. I think initially, the requirement that they had projected was for 120 Mk2 aircraft. But let them deliver the prototypes, let them be evaluated, and we'll see thereafter..."

"For LCA, or for Tejas Mk2, LCA Mk2. We should follow a process of spiral development, upgrade it, and develop it within the existing public-sector ecosystem, HAL, which, incidentally, is increasingly using a lot of private-sector support to make not only the sub-assemblies but also some of the larger components, including fuselages. They have brought in a private-sector production line for some of these things as well. It will be public-sector-led, in all probability, but significant involvement of the Indian private industry and the MSME sector is, in any case, built into this programme as well"
 
AMCA i guess will have MADL type data link, i hope that it atleast matches the current MADL version if not exceeds as AMCA will not come before 2035.

So my question is, will Tejas Mk2 will also have same SDR and data link ?

As Tejas mk2 will comes only after 2032, and will be produced along with AMCA, so it would be good if both can communicate natively and tejas mk2 can get sensor data(not just result), it would greatly enhance it's interoperability with AMCA.

So if any one knows about this, then please tell me about the data link capabilities of Tejas mk2.
 

Turning to the medium-weight LCA Mk2 program, Bhadauria offered fresh detail on what has slowed down the prototype’s timeline, pointing specifically to landing gear development issues.

“From where they are now, there’s been some delay. I think some of the delay was undercarriage related. They got into some problem,” Bhadauria revealed.

While acknowledging that design and development (D&D) challenges are par for the course in complex fighter jet engineering, he called for accelerated work routines and advanced testing methodologies to recover lost ground. “D&D delays we have to give it to HAL, but I also want HAL and everybody involved in this to move much, much faster,” he said.​
 
@Hellfire used to tell that MK2 will not happen. He is right on mk2 i fear now.

@randomradio @Rajput Lion @vstol Jockey
IAF is low on numbers, they'll probably take anything can get, and on paper MK2 has all the bells and whistles.

Engine is what could do it in, however, they have already spent hundreds of millions on the program, CAG will gnash its teeth down to gums if the program is cancelled now. That's enough money that this para would be presented to a parliamentary committee.
 
Last edited:
Ask @Hellfire he is the one said this long back in twitter. What ever he says in past happened to a reality later.
also few days back defence secretary too made skeptical statement on MK2.
Tejas MK2 is CCS cleared and has IAF backing. Last i checked, CCS outranked DS, and IAF doesn't answer to DS.

Tejas MK2 is safe as long as they can secure the engines.
 
@Hellfire used to tell that MK2 will not happen. He is right on mk2 i fear now.

@randomradio @Rajput Lion @vstol Jockey
I think it will happen but will inevitably come way later than anticipated.

IMO they should limit mk2 to 3-4 squadrons. Treat it lile a concept car with a limited production run. Enough to prove out technology evolution/integration for AMCA. I'd focus on secure datalinks, MUM-T interfaces, and eventually CATS control.

The roadmap for the IAF I'd like to see going into the mid to late 2030s is something like AMCA + FCAS/next-gen + large numbers of CATS/CCAs, with Mk1A/Mk2/Rafale progressively becoming the outer-layer missile trucks and (increasinly irrelevant) conventional combat mass.
 
  • Like
Reactions: screambowl
T
I think it will happen but will inevitably come way later than anticipated.

IMO they should limit mk2 to 3-4 squadrons. Treat it lile a concept car with a limited production run. Enough to prove out technology evolution/integration for AMCA. I'd focus on secure datalinks, MUM-T interfaces, and eventually CATS control.

The roadmap for the IAF I'd like to see going into the mid to late 2030s is something like AMCA + FCAS/next-gen + large numbers of CATS/CCAs, with Mk1A/Mk2/Rafale progressively becoming the outer-layer missile trucks and (increasinly irrelevant) conventional combat mass.
They need atleast 6 squadrons to replace the old jets, assuming Rafale replaces the remaining


FCAS is story of 2040s and starting to look more like AMCA rather than some 6th gen platform