General News, Questions And Discussions - Indian Navy


The contract for Varunastra was signed with Bharat Dynamics Limited, Hyderabad worth Rs 1,543 crore. Varunastra is an indigenous ship-launched anti-submarine torpedo developed by the Naval Science and Technological Laboratory. Equipped with advanced maneuvering capabilities, it is capable of engaging enemy submarines at long ranges, thereby enhancing the anti-submarine warfare capability of the Indian Navy.
 
I am not able to figure out the total 78. Either AoN has been given for 02 Next Generation Multi-Purpose Vessels or something else. I am having the following numbers:

#Under Construction: (42)

1. Samarthak class MPV = 01
2. Sachi class OPV = 11
3. Next Generation Missile Vessel = 06
4. Nilgiri class FFG = 01
5. Talwar class FFG = 02
6. Mahe class ASWSWC = 05
7. Arnala class ASWSWC = 04
8. Krishna class CTS = 03
9. Fleet Support Ship = 05
10. Diving Support Craft = 04



#Future Projects:

• Cost Negotiation stage: (19)
1. Project 75I class SSK = 06
2. Next Generation Corvette = 08
3. Next Generation Survey Vessels = 05



• RFP: (13)

1. Next Generation MPV = 02
2. LHD = 04
3. P-17B class FFG = 07


• AoN: (43)
1. New Water Jet Fast Attack Craft = 31
2. Mine Counter Measure Vessels = 12
3. Fast Interceptor Craft-I = 120

Total: 75

• RFI: (13)
1. High Speed Landing Crafts = 06
2. National Hospital Ship = 01
3. LCU MK - V = 06

There might be a possibility that they are also including 3 additional Scorpene class SSK.
 
I am not able to figure out the total 78. Either AoN has been given for 02 Next Generation Multi-Purpose Vessels or something else. I am having the following numbers:

#Under Construction: (42)

1. Samarthak class MPV = 01
2. Sachi class OPV = 11
3. Next Generation Missile Vessel = 06
4. Nilgiri class FFG = 01
5. Talwar class FFG = 02
6. Mahe class ASWSWC = 05
7. Arnala class ASWSWC = 04
8. Krishna class CTS = 03
9. Fleet Support Ship = 05
10. Diving Support Craft = 04



#Future Projects:

• Cost Negotiation stage: (19)
1. Project 75I class SSK = 06
2. Next Generation Corvette = 08
3. Next Generation Survey Vessels = 05



• RFP: (13)

1. Next Generation MPV = 02
2. LHD = 04
3. P-17B class FFG = 07


• AoN: (43)
1. New Water Jet Fast Attack Craft = 31
2. Mine Counter Measure Vessels = 12
3. Fast Interceptor Craft-I = 120

Total: 75

• RFI: (13)
1. High Speed Landing Crafts = 06
2. National Hospital Ship = 01
3. LCU MK - V = 06

There might be a possibility that they are also including 3 additional Scorpene class SSK.
Few changes:

• Cost Negotiation stage: (22)
1. Project 75I class SSK = 06
2. Next Generation Corvette = 08
3. Next Generation Survey Vessels = 05
4. Additional Scorpene class SSK = 03

• RFP: (11)
1. P-17B class FFG = 07
2. LHD = 04

• AoN: (45)
1. Next Generation MPV = 02
2. New Water Jet Fast Attack Craft = 31
3. Mine Counter Measure Vessels = 12
4. Fast Interceptor Craft-I = 120

Total: 78 + 120
 
Few changes:

• Cost Negotiation stage: (22)
1. Project 75I class SSK = 06
2. Next Generation Corvette = 08
3. Next Generation Survey Vessels = 05
4. Additional Scorpene class SSK = 03

• RFP: (11)
1. P-17B class FFG = 07
2. LHD = 04

• AoN: (45)
1. Next Generation MPV = 02
2. New Water Jet Fast Attack Craft = 31
3. Mine Counter Measure Vessels = 12
4. Fast Interceptor Craft-I = 120

Total: 78 + 120

+1 Akula