Brahmos Supersonic Cruise Missile : News, Updates and Discussions

Now, the whole missile is almost indigenous, sans the Ramjet engine which is of Russian origin. We are now making efforts to even get that technology into the country, maybe 6-8 years down the line," he added.

I thought we already mastered this technology & are on our way to develop the SCRAMJET within 6-7 yrs. What's he talking about ?
 
  • Like
Reactions: RASALGHUL
I thought we already mastered this technology & are on our way to develop the SCRAMJET within 6-7 yrs. What's he talking about ?
Our LFRJ STAR is yet to make enough ground to be put into a missile yet. Frankly I think other mission mode projects like BMD, astra vlsrsam vshorads ngarm etc got priority & STAR SFDR etc are a bit sidelined now. DRDO did say they have shortage of manpower (6913 currently vs sanctioned 7700 scientists level) so projects are taken by priority basis.
 
  • Like
Reactions: _Anonymous_
Our LFRJ STAR is yet to make enough ground to be put into a missile yet. Frankly I think other mission mode projects like BMD, astra vlsrsam vshorads ngarm etc got priority & STAR SFDR etc are a bit sidelined now. DRDO did say they have shortage of manpower (6913 currently vs sanctioned 7700 scientists level) so projects are taken by priority basis.

So going by the T/L he's put out we'd be mastering both the RAMJET & SCRAMJET technologies around the same time .
 
Our LFRJ STAR is yet to make enough ground to be put into a missile yet. Frankly I think other mission mode projects like BMD, astra vlsrsam vshorads ngarm etc got priority & STAR SFDR etc are a bit sidelined now. DRDO did say they have shortage of manpower (6913 currently vs sanctioned 7700 scientists level) so projects are taken by priority basis.
SFDR can't be sidelined. It's vital for our air dominance. If this news is true then it's absolutely pathetic. Only reason I may think for delay of this high-level JV could be Russia-Ukraine war. Maybe Russian help is required to move this project at a fast pace. Last I heard, literally all ground tests were done and they were preparing for flight trials. The delay news is absolutely heart-breaking if true🤦‍♂️
 
So going by the T/L he's put out we'd be mastering both the RAMJET & SCRAMJET technologies around the same time .
their TL is like accelerating brahmos itself, almost certainly several years on the extended side. But heard from people who had good discussion with them during defexpo and according to them the NG version is targeted for 2024 at the earliest.
SFDR can't be sidelined. It's vital for our air dominance. If this news is true then it's absolutely pathetic. Only reason I may think for delay of this high-level JV could be Russia-Ukraine war. Maybe Russian help is required to move this project at a fast pace. Last I heard, literally all ground tests were done and they were preparing for flight trials. The delay news is absolutely heart-breaking if true🤦‍♂️
Not wholly sidelined, rather the intensity of the tests will be low, compared to systems like vshorads mpatgm etc which are of higher priority to the user and will see relatively frequent testing.
 
BrahMos Aerospace is also working on a lighter version of the Brahmos missile, dubbed BrahMos NG (new generation); the missile is undergoing development and could have its maiden test flight by 2024-end, he said.


At last, some credible update on NG. Looks like they are funding themselves.
 
Struggling to keep track now, today STFE manik engine forgings tender came out. Hopefully the bigger accounts cover it soon.
 
Aatmanirbhar Bharat: MoD inks contract with BrahMos Aerospace Private Limited for Next Generation Maritime Mobile Coastal Batteries (Long range) & BrahMos Missiles worth Rs 1,700 crore
Posted On: 30 MAR 2023 6:56PM by PIB Delhi
Ministry of Defence, on March 30, 2023, inked a contract with BrahMos Aerospace Private Limited (BAPL) for procurement of Next Generation Maritime Mobile Coastal Batteries (Long range) {NGMMCB (LR)} and BrahMos Missiles at an approximate cost of over Rs 1,700 crore under Buy (Indian) Category. The delivery of NGMMCBs is scheduled to commence from 2027. These systems will be equipped with supersonic BrahMos Missiles and will significantly enhance multi-directional maritime strike capability of Indian Navy.

The BAPL is a Joint Venture between India and Russia making crucial contribution to augment the new generation Surface-to-Surface missile with enhanced ranges. This contract is going to give further boost to indigenous production of critical weapon system and ammunition with active participation of indigenous industries. This project will generate an employment of more than 90,000 man-days over a period of four years. With the majority of the equipment and sub-system sourced from indigenous manufacturers, these systems will be a proud flag bearer of ‘Aatmanirbhar Bharat’.

*******

ABB/Savvy
 
  • Like
Reactions: marich01
Under paywall so if anyone can access please tell if anything news worthy

Screenshot.png

 
Under paywall so if anyone can access please tell if anything news worthy

View attachment 27239

 
  • Like
Reactions: marich01
Under paywall so if anyone can access please tell if anything news worthy

View attachment 27239


Last year, CEO of BrahMos Aerospace, Atul Rane had said that it was "possible" that BrahMos-II would share some characteristics with Russia's Tsirkon missile.

"The whole world is working on a hypersonic cruise missile. The US and China are developing hypersonic versions of their cruise missiles. But they do not have them yet. I have not seen anyone in the world having hypersonic cruise missiles. Russia says it tested the Tsirkon hypersonic antiship cruise missile developed by NPO Mashinostroeniya," Rane told Russian news agency TASS last year. Rane had then stated that "technology bricks" for a hypersonic missile have been designed by both sides.

Everything else was just general stuff you already know.
 
  • Like
Reactions: marich01