General News, Questions And Discussions - Indian Navy

" Under the contract, INS Betwa, a Brahmaputra-class frigate of the Indian Navy, will undergo a major propulsion system transformation, involving the replacement of its existing steam-based propulsion system with a diesel-engine-based propulsion system. The refit will also include the upgradation of its combat capabilities through the installation of a modernised weapon suite, thereby enhancing the ship's operational effectiveness. "

What are the chances we see the new Kirloskar engines on this? Could be a great opportunity.
 
There was a GRSE concall today.

Interesting updates:

First he informed the bids for P-17B are closing next week and the L1 is expected 4 months from now within this financial year. He gave a very conservative timeline to CCS of 1 year after that as Q4 FY 27-28.

He also mentioned Next generation destroyer & Project 15 Charlie I don’t know if he meant separately or what has been currently approved is just Project 15C.

1795089167990.png

 
Last edited:
There was a GRSE concall today.

Interesting updates:

First he informed the bids for P-17B are closing next week and the L1 is expected 4 months from now within this financial year. He gave a very conservative timeline to CCS of 1 year after that as Q4 FY 27-28.

He also mentioned Next generation destroyer & Project 15 Charlie I don’t know if he meant separately or what has been currently approved is just Project 15C.

View attachment 55426

I have this old highly speculative theory (so take it with a grain of salt) that what has been distributed as project 18 design is actually the design of Project 15C.

1795091886791.png


4x GT + 4x diesel configuration probably 10k tons.

Inspired from Maya class design may even have its COGLAG setup.


While Project 18 is a 128 VLS 14K tons vessel.
 
I have this old highly speculative theory (so take it with a grain of salt) that what has been distributed as project 18 design is actually the design of Project 15C.

View attachment 55427


4x GT + 4x diesel configuration probably 10k tons.

Inspired from Maya class design may even have its COGLAG setup.


While Project 18 is a 128 VLS 14K tons vessel.
This design is way different than P15b.

So i don't think they will make a new design and does not give it a new project name.

The above design does not look like evolution of P15b.

My guess:

1. CODAD
2. 16 NASM-MR
3. 16 VL-SRSAM
4. MFR-X
5. Scantar 6000 SSR
6. 04 SRCG
7. LTR-25 ASR
Don't think it will include VL-SRSAM because of this.
 
  • Like
Reactions: Anupu
I have this old highly speculative theory (so take it with a grain of salt) that what has been distributed as project 18 design is actually the design of Project 15C.

View attachment 55427


4x GT + 4x diesel configuration probably 10k tons.

Inspired from Maya class design may even have its COGLAG setup.


While Project 18 is a 128 VLS 14K tons vessel.

I'd be impressed if they could build up the superstructure to the extent that it mount a 4 panel aesa AND a mfr on main mast.

It may be possible if the hull width (beam) were to be increased with a corresponding increase in length for better seakeeping, etc. Also those power hunger radars would need an all new propulsion system.

P-15 baseline design would need a major surgery for all this.
 
I'd be impressed if they could build up the superstructure to the extent that it could mount a 4 panel aesa AND a mfr main mast.

It may be possible if the hull width (beam) were to be increased with a corresponding increase in length for better seakeeping, etc. Also those power hunger radars would need an all new propulsion system.

P-15 baseline design would need a major surgery for all this.
I don't think there is MF-STAR on main mast but a smaller X band radar for fire control like in Type-55.

Anyways the above design is way to different than P15b that will demand a seperate project and hence new project name.
 
  • Like
Reactions: Anupu
I don't think there is MF-STAR on main mast but a smaller X band radar for fire control like in Type-55.

Anyways the above design is way to different than P15b that will demand a seperate project and hence new project name.

I must say the raised foredeck looks about the same length as P-15A/B so you never know. The Americans did some major remodeling on their Flight 3 AB class DDG to fit the new gen Spy-6 radar so it's not outside the realm of possibility.

But will the cost and complexity be worth it vs a cleansheet design for the IN? Guess we'll have to wait to find out.
 
This design is way different than P15b.

So i don't think they will make a new design and does not give it a new project name.

The above design does not look like evolution of P15b.
Boss Project 28A and Project 28 are fundamentally different ships. P-17A is very different from P-17. In fact, Project 15B was also going to be different from Project 15A, but the Kolkata class was massively delayed, and we ended up just repeating it as P-15B.


I must say the raised foredeck looks about the same length as P-15A/B so you never know. The Americans did some major remodeling on their Flight 3 AB class DDG to fit the new gen Spy-6 radar so it's not outside the realm of possibility.

But will the cost and complexity be worth it vs a cleansheet design for the IN? Guess we'll have to wait to find out.
The Ukrainian Gas turbine on P-15s is gone. We would need something else; this seems to me like an intermediate ship while developing the proper NGD P-18. Perhaps using the Maya class as a baseline; I mean, this design is also missing the Lanza L if it were just Vizag modernised.

At least that is my theory.
 
The Ukrainian Gas turbine on P-15s is gone. We would need something else; this seems to me like an intermediate ship while developing the proper NGD P-18. Perhaps using the Maya class as a baseline; I mean, this design is also missing the Lanza L if it were just Vizag modernised.

At least that is my theory.

The general layout looks like similar to P-15A/B (raised foredeck, smoke stack, exposed RHIBs et al).

Likely is a follow-on design with new propulsion? I'd have gone with a scaled up P-17A/B. But this could be just 1 of many concepts under consideration at WDB.

I doubt we'd take inspiration from the Maya or any other foreign warship design but who knows.
 
There was a GRSE concall today.

Interesting updates:

First he informed the bids for P-17B are closing next week and the L1 is expected 4 months from now within this financial year. He gave a very conservative timeline to CCS of 1 year after that as Q4 FY 27-28.

He also mentioned Next generation destroyer & Project 15 Charlie I don’t know if he meant separately or what has been currently approved is just Project 15C.

View attachment 55426



Important stuff -

Bids submitted for
1. 22 Interceptor Vessels for ICG - ₹1100 cr
2. 6 NG-OPV - ICG - ₹3,500 cr
3. 31 FPVs- IN - ₹15,000 cr
4. 120 Patrol Boats - IN - ₹4,500 cr

Live Bids

1. P17B
2. LPD
3. MCMV

These, in addition to 5 NG Survey Vessels for which csl is L1.
 
Important stuff -

Bids submitted for
1. 22 Interceptor Vessels for ICG - ₹1100 cr
2. 6 NG-OPV - ICG - ₹3,500 cr
3. 31 FPVs- IN - ₹15,000 cr
4. 120 Patrol Boats - IN - ₹4,500 cr

Live Bids

1. P17B
2. LPD
3. MCMV

These, in addition to 5 NG Survey Vessels for which csl is L1.
Yes, a lot of interesting information

P-17 Bravo bids are almost submitted now, with only 1 week remaining before the bids close.


ASW-SWC 6th ship delivery in 1 week,

Last Project 17A; effort to deliver this month.

NGC first ship delivery in H2 2032.
 
I have this old highly speculative theory (so take it with a grain of salt) that what has been distributed as project 18 design is actually the design of Project 15C.
That simply dont make sense. Project 18 was always clean sheet 10k+ ton design started 5-6 years back. They probably tried to work with japaness and italians as they know its a hard ask to design everything themselves. After iterations they have refined the requirements with a new code name of project 18A which is probably more ambitious because of evolved requirement of more and more VLS cells.

I'm hoping Project 15C is a Visakhapatnam-class with an MT30 and more VLS cells in place of the RBU-6000.
 
That simply dont make sense. Project 18 was always clean sheet 10k+ ton design started 5-6 years back. They probably tried to work with japaness and italians as they know its a hard ask to design everything themselves. After iterations they have refined the requirements with a new code name of project 18A which is probably more ambitious because of evolved requirement of more and more VLS cells.

I'm hoping Project 15C is a Visakhapatnam-class with an MT30 and more VLS cells in place of the RBU-6000.
As I said, It's pure speculation on my part.
 
Are you saying P15C project exist ? Did they get AoN ?
There is no P-15C as of now. This is just being pitched by MDL to IN. I don't know how we have come to the nomenclature of P-18A because everywhere IN had mentioned these as Next Generation Destroyers or NGD. There is also no clarity of the number, either it's 05 or 08. Chances are it will be 05 to bring the sanctioned strength to 15 and no Delhi-class will be retired before 2040s.