My guess:
1. CODAD
2. 16 NASM-MR
3. 16 VL-SRSAM
4. MFR-X
5. Scantar 6000 SSR
6. 04 SRCG
7. LTR-25 ASR
I read it's just the Combat Mgmt System getting updated.
My guess:
1. CODAD
2. 16 NASM-MR
3. 16 VL-SRSAM
4. MFR-X
5. Scantar 6000 SSR
6. 04 SRCG
7. LTR-25 ASR
" Under the contract, INS Betwa, a Brahmaputra-class frigate of the Indian Navy, will undergo a major propulsion system transformation, involving the replacement of its existing steam-based propulsion system with a diesel-engine-based propulsion system. The refit will also include the upgradation of its combat capabilities through the installation of a modernised weapon suite, thereby enhancing the ship's operational effectiveness. "
What are the chances we see the new Kirloskar engines on this? Could be a great opportunity.

I have this old highly speculative theory (so take it with a grain of salt) that what has been distributed as project 18 design is actually the design of Project 15C.There was a GRSE concall today.
Interesting updates:
First he informed the bids for P-17B are closing next week and the L1 is expected 4 months from now within this financial year. He gave a very conservative timeline to CCS of 1 year after that as Q4 FY 27-28.
He also mentioned Next generation destroyer & Project 15 Charlie I don’t know if he meant separately or what has been currently approved is just Project 15C.
View attachment 55426

This design is way different than P15b.I have this old highly speculative theory (so take it with a grain of salt) that what has been distributed as project 18 design is actually the design of Project 15C.
View attachment 55427
4x GT + 4x diesel configuration probably 10k tons.
Inspired from Maya class design may even have its COGLAG setup.
While Project 18 is a 128 VLS 14K tons vessel.
Don't think it will include VL-SRSAM because of this.My guess:
1. CODAD
2. 16 NASM-MR
3. 16 VL-SRSAM
4. MFR-X
5. Scantar 6000 SSR
6. 04 SRCG
7. LTR-25 ASR
I have this old highly speculative theory (so take it with a grain of salt) that what has been distributed as project 18 design is actually the design of Project 15C.
View attachment 55427
4x GT + 4x diesel configuration probably 10k tons.
Inspired from Maya class design may even have its COGLAG setup.
While Project 18 is a 128 VLS 14K tons vessel.
I don't think there is MF-STAR on main mast but a smaller X band radar for fire control like in Type-55.I'd be impressed if they could build up the superstructure to the extent that it could mount a 4 panel aesa AND a mfr main mast.
It may be possible if the hull width (beam) were to be increased with a corresponding increase in length for better seakeeping, etc. Also those power hunger radars would need an all new propulsion system.
P-15 baseline design would need a major surgery for all this.
I don't think there is MF-STAR on main mast but a smaller X band radar for fire control like in Type-55.
Anyways the above design is way to different than P15b that will demand a seperate project and hence new project name.
Boss Project 28A and Project 28 are fundamentally different ships. P-17A is very different from P-17. In fact, Project 15B was also going to be different from Project 15A, but the Kolkata class was massively delayed, and we ended up just repeating it as P-15B.This design is way different than P15b.
So i don't think they will make a new design and does not give it a new project name.
The above design does not look like evolution of P15b.
The Ukrainian Gas turbine on P-15s is gone. We would need something else; this seems to me like an intermediate ship while developing the proper NGD P-18. Perhaps using the Maya class as a baseline; I mean, this design is also missing the Lanza L if it were just Vizag modernised.I must say the raised foredeck looks about the same length as P-15A/B so you never know. The Americans did some major remodeling on their Flight 3 AB class DDG to fit the new gen Spy-6 radar so it's not outside the realm of possibility.
But will the cost and complexity be worth it vs a cleansheet design for the IN? Guess we'll have to wait to find out.
The Ukrainian Gas turbine on P-15s is gone. We would need something else; this seems to me like an intermediate ship while developing the proper NGD P-18. Perhaps using the Maya class as a baseline; I mean, this design is also missing the Lanza L if it were just Vizag modernised.
At least that is my theory.
There was a GRSE concall today.
Interesting updates:
First he informed the bids for P-17B are closing next week and the L1 is expected 4 months from now within this financial year. He gave a very conservative timeline to CCS of 1 year after that as Q4 FY 27-28.
He also mentioned Next generation destroyer & Project 15 Charlie I don’t know if he meant separately or what has been currently approved is just Project 15C.
View attachment 55426
Yes, a lot of interesting informationImportant stuff -
Bids submitted for
1. 22 Interceptor Vessels for ICG - ₹1100 cr
2. 6 NG-OPV - ICG - ₹3,500 cr
3. 31 FPVs- IN - ₹15,000 cr
4. 120 Patrol Boats - IN - ₹4,500 cr
Live Bids
1. P17B
2. LPD
3. MCMV
These, in addition to 5 NG Survey Vessels for which csl is L1.
That simply dont make sense. Project 18 was always clean sheet 10k+ ton design started 5-6 years back. They probably tried to work with japaness and italians as they know its a hard ask to design everything themselves. After iterations they have refined the requirements with a new code name of project 18A which is probably more ambitious because of evolved requirement of more and more VLS cells.I have this old highly speculative theory (so take it with a grain of salt) that what has been distributed as project 18 design is actually the design of Project 15C.
Thank you so much for sharing these updates.Important stuff -
Bids submitted for
1. 22 Interceptor Vessels for ICG - ₹1100 cr
2. 6 NG-OPV - ICG - ₹3,500 cr
3. 31 FPVs- IN - ₹15,000 cr
4. 120 Patrol Boats - IN - ₹4,500 cr
Live Bids
1. P17B
2. LPD
3. MCMV
These, in addition to 5 NG Survey Vessels for which csl is L1.
As I said, It's pure speculation on my part.That simply dont make sense. Project 18 was always clean sheet 10k+ ton design started 5-6 years back. They probably tried to work with japaness and italians as they know its a hard ask to design everything themselves. After iterations they have refined the requirements with a new code name of project 18A which is probably more ambitious because of evolved requirement of more and more VLS cells.
I'm hoping Project 15C is a Visakhapatnam-class with an MT30 and more VLS cells in place of the RBU-6000.
There is no P-15C as of now. This is just being pitched by MDL to IN. I don't know how we have come to the nomenclature of P-18A because everywhere IN had mentioned these as Next Generation Destroyers or NGD. There is also no clarity of the number, either it's 05 or 08. Chances are it will be 05 to bring the sanctioned strength to 15 and no Delhi-class will be retired before 2040s.Are you saying P15C project exist ? Did they get AoN ?